Related Content
Find content from Prior Lake Spring Lake Watershed District related to your topic.
Swamp Lake Iron Enhanced Sand Filter Project
The Swamp Iron Enhanced Sand Filter (IESF) is an important part of watershed nutrient reduction and preventing nutrients from reaching the downstream County Ditch 13 system, Spring Lake and Prior Lakes. The Swamp IESF is expected to filter, bind with excess nutrients, and remove 89 lbs of Phosphorus per year, and presents one of most cost-effective, and far-reaching solutions in the watershed strategy.
Prior Lake-Spring Lake Watershed District Watershed Week News
Wathershed Week Free Events
PRIOR LAKE-SPRING LAKE WATERSHED DISTRICT NOTICE OF PUBLIC HEARING - 2026 BUDGET AND LEVY News
Public Hearing Notice
Carp-tivated by Fun: Successful Carp Carnival Event News
Post regarding the carp carnival
Celebrate Carp Carnival at Sand Point Beach Park - July 26, 2025! News
Join the Prior Lake-Spring Lake Watershed District for a FREE and fun-filled day at the Carp Carnival!
Lake Ridge Estates Pond Retrofit Feasibility Study Document
Expand topics
Collapse topics
Waterbodies:Topic:Resource topic:
Prior Lake Outlet Pipelining Project
Maintaining and improving the critical first leg of the Prior Lake Outlet Channel.
The Prior Lake Outlet Channel pipe lining is complete News
One of the largest jobs ever undertaken by the PLSLWD was completed in May. The Prior Lake Outlet Channel (PLOC) pipe was lined using a Cured In Place Pipe (CIPP) method where no excavation along the pipe needed to be done.
PLSLWD Board, CAC and District Staff annual District Tour News
On Thursday May 29 the PLSLWD Board of Directors, Citizens Advisory Committee (CAC) members and District staff toured three areas of the Watershed where projects are being worked on or have been completed.
Welcome Teresa Gostonczik to the PLSLWD News
Say hello to our newest employee, Teresa Gostonczik
2024 Lower Prior Lake Water Quality Report Card Document
Expand topics
Collapse topics
2024 Upper Prior Lake Water Quality Report Card Document
Expand topics
Collapse topics
2024 Buck Lake Report Card Document
The PLSLWD 2024 Annual Report News
The 2024 Annual Report of the PLSLWD is now available.
2024 Annual Report Document
2024 SCWEP Annual Report Document
Expand topics
Collapse topics
2024 PLOC Operations Report with Attachments Document
Expand topics
Collapse topics
Waterbodies:Topic:Resource topic:
Lake Ridge Estates Pond Retrofit Feasibility Study Document
Expand topics
Collapse topics
Waterbodies:Topic:Resource topic:
2024 Lower Prior Lake Water Quality Report Card Document
Expand topics
Collapse topics
2024 Upper Prior Lake Water Quality Report Card Document
Expand topics
Collapse topics
2024 Buck Lake Report Card Document
2024 Annual Report Document
2024 SCWEP Annual Report Document
Expand topics
Collapse topics
2024 PLOC Operations Report with Attachments Document
Expand topics
Collapse topics
Waterbodies:Topic:Resource topic:
2025 Approved Budget Document
2024 Approved Budget Document
2024 Swamp Lake Plant Survey Document
2024 Upper and Lower Prior Lakes Curly Leaf Pondweed and Lower Prior Plant Surveys Document
Expand topics
Collapse topics
2024 Pike Lake Plant Survey Document
2024 Jeffers Pond Plant Survey Document
2024 Crystal Lake Plant Survey Document
2025 Education and Outreach Plan Document
2023 Annual Financial Report Document
2021 Report (Waterfront Restoration) Document
Prior Lake-Spring Lake Watershed District Watershed Week News
Wathershed Week Free Events
PRIOR LAKE-SPRING LAKE WATERSHED DISTRICT NOTICE OF PUBLIC HEARING - 2026 BUDGET AND LEVY News
Public Hearing Notice
Carp-tivated by Fun: Successful Carp Carnival Event News
Post regarding the carp carnival
Celebrate Carp Carnival at Sand Point Beach Park - July 26, 2025! News
Join the Prior Lake-Spring Lake Watershed District for a FREE and fun-filled day at the Carp Carnival!
The Prior Lake Outlet Channel pipe lining is complete News
One of the largest jobs ever undertaken by the PLSLWD was completed in May. The Prior Lake Outlet Channel (PLOC) pipe was lined using a Cured In Place Pipe (CIPP) method where no excavation along the pipe needed to be done.
PLSLWD Board, CAC and District Staff annual District Tour News
On Thursday May 29 the PLSLWD Board of Directors, Citizens Advisory Committee (CAC) members and District staff toured three areas of the Watershed where projects are being worked on or have been completed.
Welcome Teresa Gostonczik to the PLSLWD News
Say hello to our newest employee, Teresa Gostonczik
The PLSLWD 2024 Annual Report News
The 2024 Annual Report of the PLSLWD is now available.
New PLSLWD Office Hours News
Please note our new office hours: we are open Monday-Thursday 8:30-4:30pm, and on Friday by appointment. You can also call us at 952-447-4166 or email us at info@plslwd.org.
2024 Annual Newsletter News
We accomplished a lot in 2024! Our Annual Newsletter summarizes some highlights of our activities throughout the year.
Expand topics
Collapse topics
From Flooding to Drought - The Dynamics of Prior Lake's Water Levels News
In the last couple years, we've experienced low and high water levels. The following article offers insight into the factors that contribute to our lake levels and how the PLSLWD takes steps to reduce flooding.
Happy 2025 - Great news about the Carp Population in Upper Prior Lake News
Since 2015, PLSLWD has been hard at work reducing the carp population in Upper Prior Lake and we've made incredible progress!
Emily Dick, PLSLWD Project Manager, named 2024 MN Outstanding Watershed Employee News
At the Minnesota Watershed Conference held in Nisswa last week, PLSLWD's Project Manager, Emily Dick, was named the 2024 Outstanding Watershed Organization Employee by BWSR (Minnesota Board of Water and Soil Resources), due in large part having obtained a nearly $1,000,000 grant to repair the Prior Lake Outlet Pipe which is in need of pipe lining which will maintain the pipe's life for another 50 years.. The work on the pipe will happen in 2025.
Expand topics
Collapse topics
Waterbodies:Topic:
Buckthorn Wreath Making Event - Check out the beautiful creations News
The PLSLWD along with community artist, Kimberly Boustead, hosted a Buckthorn wreath making event.
District Awarded Over $850,000 MPCA Grant News
After many months of searching for funding, the District has been awarded over $850,000 in MPCA grant funding for the Prior Lake Outlet Pipelining! This project will double the lifespan and restore the capacity of Prior Lake's only "relief valve," a critical piece of infrastructure for flood relief.
Expand topics
Collapse topics
Waterbodies:Topic:
What to know about Blue-Green Algae News
The Watershed District has received a number of reports of suspected Blue-Green Algae this summer. Read the full news story for complete information about it
Expand topics
Collapse topics
Swamp Lake Iron Enhanced Sand Filter Project
The Swamp Iron Enhanced Sand Filter (IESF) is an important part of watershed nutrient reduction and preventing nutrients from reaching the downstream County Ditch 13 system, Spring Lake and Prior Lakes. The Swamp IESF is expected to filter, bind with excess nutrients, and remove 89 lbs of Phosphorus per year, and presents one of most cost-effective, and far-reaching solutions in the watershed strategy.
Prior Lake Outlet Pipelining Project
Maintaining and improving the critical first leg of the Prior Lake Outlet Channel.
Buck Stream Stabilization Project
Preventing erosion on 1,300 feet of stream by reconnecting its natural floodplain.
Prior Lake Outlet Channel Repairs: Bank Erosion Project
Bank erosion repair work has been completed along the channel. Maintenance for vegetation reestablishment is an ongoing project.
Expand topics
Collapse topics
Sutton Lake Outlet Project
The Sutton Lake Outlet project constructed a controlled outlet structure at the Sutton Lake Blvd culvert crossing to store stormwater in Sutton Lake.
Upper Prior Lake Alum Treatment Project
Studies by the Prior Lake-Spring Lake Watershed District determined Upper Prior Lake was impaired/threatened by an excess of phosphorus and recommended that the phosphorus concentration should be reduced by to achieve water quality goals.
Spring Lake Alum Treatment Project
PLSLWD treated Spring Lake with Aluminum Sulfate (Alum) in 2013, 2018, and 2020.
Ferric Chloride Treatment Facility Project
The Ferric Chloride Treatment Facility is one of the District's "nutrient reduction powerhouses". Reducing nutrients reaching Spring Lake is essential for preventing algal blooms and other water quality problems.
Fish Lake Shoreline Enhancement & Prairie Restoration Project
The project enhanced a section of shoreline along Fish Lake behind the Spring Lake Township town hall and implemented a prairie restoration on the north side of the property.
Expand topics
Collapse topics
Waterbodies:Topic:
Sand Point Beach Park Project Project
The Sand Point Beach Park Pond Improvements Project improves the efficiency of stormwater treatment before it enters Prior Lake. The project includes three components: Maintenance & Expansion of the Two Existing Ponds, Iron-Enhanced Sand Filter, and Prairie Restoration.
Expand topics
Collapse topics
Raymond Park Restoration Project Project
The restoration project includes buckthorn removal, an oak savanna restoration, beach plant community restoration, shoreline restoration and replacing the existing turf grass with low-maintenance grass.
Expand topics
Collapse topics
Waterbodies:Topic:
Watzl’s Beach Shoreline Restoration Project
The shoreline area at Watzl’s beach was previously dominated by invasive plants and erosion was occurring at the shoreline. As such, the site was in desperate need of restoration.
Indian Ridge Water Quality Improvement Project
The project will filter out sediments and nutrients from the stormwater that runs off properties and streets in the Indian Ridge Park neighborhood before it reaches Lower Prior Lake.
Fish Point Park Retrofits Project
The Fish Point Park Retrofit project includes three elements: retrofitting an existing ditch section with in-line iron-sand filters, expanding storage capacity and creating wetland upstream of the ditch, and installing a new predictive control structure in the existing berm.
Expand topics
Collapse topics
Waterbodies:Topic:
Spring Lake Shoreline Restoration Project
Shoreline restoration prevents soil erosion from entering our lake, as well as providing filtration for other pollutants. Native plants provide bank stabilization, water filtration, and habitat improvement. Three main shoreline restoration techniques were used to stabilize these areas: brush bundles, cedar revetment and native plantings with erosion control blanket.
Expand topics
Collapse topics
Waterbodies:Topic:
Arctic Lake Restoration Project Project
This project consists of three components: retrofitting stormwater ponds with iron-sand filters, restoring a wetland, and managing carp.
Expand topics
Collapse topics
Waterbodies:Topic:
CR 12/17 Wetland Restoration Project
The CR12/17 Wetland Restoration Project is an innovative stormwater treatment project intended to improve water quality in Spring Lake.
Expand topics
Collapse topics
Waterbodies:Topic:
Boudin Neighborhood Improvement Project Project
Prior Lake-Spring Lake Watershed District completed retrofit projects on the Boudin neighborhood reconstruction that previously drained untreated to Lower Prior Lake.
Expand topics
Collapse topics
Prior Lake Outlet Structure Reconstruction Project
Normal wear and tear on the outlet structure resulted in cracking to the structure and diminishing efficiency. The outlet structure was replaced in 2010.